In central London

The final arch of this striking three span bridge is expected to be lifted into place shortly. The Chiswick bridge completes the new pedestrian link between the Chiswick High Street tube station and the adjacent Technology Park in central London.

The cables are made using the recently launched Redaelli range of stainless steel Full Locked Coil cables, along with the innovative Redaelli designed cable cross over clamps. Redaelli is proud to have been a cable partner to the design and construction teams. Congratulations to everybody at Expedition Engineering, Lendlease Construction and Severfield on delivering another excellent project.